Job Opportunities API

The Public Ledger of Openings

← Back to the ledger

Low Voltage Project Manager (Owner's Representative) - Data Center Construction

KALCON
CompanyKALCON
CategoryConstruction & Trades
LocationPortsmouth
RemoteOn-site (inferred)
EmploymentNot stated
LevelManager
SalaryNot stated by the employer
Posted8 Jul 2026
Last verified12 Aug 2026
SourceEmployer ATS (greenhouse)
Applications are handled by the employer, not by us.Apply on the employer's site →
Description
KALCON is looking for a self-starting Project Manager to drive core project coordination efforts on low-voltage construction scopes on mission-critical data center construction projects. This role oversees schedule, cost, quality, safety, and coordination activities for low-voltage systems, including structured cabling, security, AV, controls, and related infrastructure. This position will serve as the primary point of contact between the Owner, General Contractor, low-voltage contractors, vendors, commissioning agents, and internal Operations teams.   Minimum Qualifications: Bachelor of Science in Construction Management, Engineering, or a related field, or equivalent professional experience 5-10+ years of experience supporting or managing construction projects of increasing complexity Experience in low-voltage and/or electrical construction management strongly preferred Data center or mission-critical facility experience preferred  Strong working knowledge of project controls, document management, and construction workflows Proficiency in Procore strongly preferred Strong communication, organizational, and leadership skills Ability to operate independently in a fast-paced, multi-project environment Duties & Responsibilities: Commissioning Support & Coordination Support the Commissioning Manager in executing the full commissioning lifecycle from construction through turnover. Assist with coordination between the General Contractor, commissioning agents, subcontractors, vendors, and design teams. Participate in commissioning planning meetings and support schedule coordination activities. Project Management & Coordination Serve as the Owner’s Representative for all assigned low-voltage scopes. Coordinate internal alignment on document reviews, contract issuances, design changes, and cost optimization efforts. Lead coordination efforts between procurement, construction management, operations, and external contractors. Maintain strong working relationships with General Contractor and trade partner teams. Translate project requirements into executable plans with minimal supervision. Schedule & Field Oversight Review and evaluate schedule updates on a biweekly basis. Perform regular site walks to validate installation progress against schedule and sequencing at a high level. Coordinate low-voltage work activities with ongoing campus operations and live environments. Develop, track, and manage MOPs for critical work in operational spaces. Cost & Commercial Management Assist with preparation of monthly financial updates and project forecasts. Manage contractor billing processes, including pay application review and coordination with Client finance teams. Lead the change order review process, ensuring accuracy of scope, cost, and documentation. Process purchase orders and manage distribution to Client vendors. Support filing and tracking of lien waivers and commercial closeout documentation. Procurement & OFCI Coordination Act as liaison between the Owner’s procurement team and the General Contractor for OFCI low-voltage equipment. Coordinate procurement status, delivery sequencing, and installation readiness. Ensure procurement activities align with construction schedules and commissioning milestones. Quality & Safety Management Enforce project quality control and safety programs through a detailed understanding of contracts and design documents. Perform a minimum of two (2) on-site safety observations per week. Manage Client safety program requirements and provide weekly HRA site walk reports. Support accurate safety metrics reporting to Client EHCS teams. Document Control & Reporting Maintain Client agendas, meeting minutes, and action item tracking. Lead smaller project meetings and document meeting outcomes throughout the project